Resita 764.425
1 July 2007

Copyright © Geoff Gauntlett 2007
W&LLR No. 19 in
the workshop at Llanfair on 1 July 2007.
A number of niggling little problems need to be sorted out before
the engine will be ready for traffic.
One of the tasks in progress when these photos were taken was the
re-arrangement of the vacuum ejector plumbing.
