Sierra Leone Railway No. 85 - Replacement of the chimney
23 February 2007

Copyright © Geoff Gauntlett 2007
The completed
chimney base is clamped to the bed of the radial arm drilling
machine for the fixing holes to be drilled.
After the six holes had been drilled they were then filed square
to prevent the dome headed fixing bolts from rotating.
The pattern for casting the chimney cap is on the table to the right of the drilling machine.
HomeCopyright © Geoff Gauntlett 2007
|